Bridge Manual

South Florida & Florida Keys Bridge Clearance Guide

Bridge clearance is one of the most important planning details for cruising from Palm Beach to Key Largo, Marathon, Key West and beyond. The key number is the vertical clearance above the water, which determines whether your boat can pass beneath a bridge without it opening.

The figures below are a planning reference for major coastal routes, not a guarantee of current clearance at every bridge. NOAA's Coast Pilot and current nautical charts are the primary references for navigation.

Before you use this list

This is a regional planning directory, not an exhaustive certified list of every bridge in every canal. Bridge reconstruction, repairs, water level and chart corrections can affect the clearance you actually encounter.

For your own boat, the most useful next step is to build a route-specific bridge spreadsheet with bridge name, waterway mile, clearance, fixed/drawbridge status, opening schedule, VHF channel, source and date verified. That makes it much easier to identify the controlling bridge for each trip.

NOAA U.S. Coast Pilot 4 (PDF)
Bridge Manual

Bridge Types

The easiest way to tell whether a bridge is fixed or opens for boats is to check a nautical chart, NOAA's Coast Pilot, or a bridge directory. Here's how to identify each type when boating from Palm Beach down to the Florida Keys.

  • Fixed Bridge

    Does not open

    A fixed bridge stays in place. Your boat must fit underneath its stated vertical clearance.

    • Look for a published clearance, such as 65 ft or 21 ft.
    • There is no opening schedule.
    • If your boat is too tall, you must use another route.
    • Account for changing water levels and leave a safety margin.
    See example photos →
  • Bascule Bridge (Drawbridge)

    Opens upward

    One or two sections rotate upward, like a seesaw.

    • Has a published clearance when closed.
    • May open on request or according to a schedule.
    • Check opening rules, restricted hours and radio procedures.
    • Do not assume that the bridge will open immediately when you arrive.
    See example photos →
  • Vertical-Lift Bridge

    Raises straight up

    The center span lifts vertically between towers.

    • Has a closed-position clearance and a higher clearance when raised.
    • May have restrictions on when it can open.
    • Check for commercial traffic and railroad operating rules.
    • Confirm the actual clearance in both the closed and raised positions.
    See example photos →
  • Swing Bridge

    Rotates sideways

    The bridge span swings horizontally away from the navigation channel.

    • Has a closed-position clearance.
    • May have a limited opening window or require advance notice.
    • Check the chart and current operating schedule.
    • Watch for current, nearby vessels and other traffic while waiting for an opening.
    See example photos →

Quick reference

Bridge types quick reference
Bridge TypeHow It MovesWhat You Need to Check
FixedDoes not moveAvailable vertical clearance
Bascule / DrawbridgeRotates upwardClosed clearance and opening rules
Vertical-liftMoves straight upwardClosed and raised clearances
SwingRotates horizontallyClosed clearance and opening rules

Important boating reminder

Your boat's air draft is the distance from the waterline to its highest point, including antennas, radar domes, lights, outriggers and masts.

Compare that measurement with the current charted bridge clearance. Water levels above the chart's reference level reduce the space available beneath a bridge.

Before departure, consult current NOAA nautical charts and the U.S. Coast Pilot for bridge type, clearance and operating information.

How to identify the type on a nautical chart

When using NOAA charts or a chartplotter:

  1. Find the bridge on your chart.
  2. Look for a label describing it as fixed, bascule, lift, or swing.
  3. Find the vertical clearance, usually shown in feet.
  4. For an opening bridge, look up its opening schedule and any restrictions separately.

On electronic charts, bridge symbols and descriptions vary by chart provider. Don't rely on the symbol alone if the bridge type is unclear.

A quick example from South Florida

South Florida bridge type examples
BridgeTypeWhat it means for you
Julia Tuttle Causeway, MiamiFixedYour boat must fit beneath the span.
Venetian Causeway, MiamiDrawbridge sectionsYou may need an opening depending on your boat's height and the span's closed clearance.
Royal Park Bridge, Palm BeachBascule drawbridgeCheck its current opening rules if your boat cannot clear it closed.
Seven Mile Bridge, MarathonFixedThe charted navigable span has a high clearance; use the correct channel.

The most important number is your boat's air draft

Your air draft is the distance from the waterline to the highest point on your boat. For example, if your boat's air draft is 22 feet:

  • A fixed bridge with 25 feet of available clearance may be passable, provided you have an adequate safety margin and account for water levels.
  • A drawbridge with 12 feet of closed clearance will require an opening.
  • A fixed bridge with 21 feet of clearance is too low under those conditions.

Remember that water levels can rise above the chart's reference level, reducing the available clearance. Antennas, radar domes, outriggers and masts count toward your boat's air draft.

Best resource to check before each trip

Use the NOAA U.S. Coast Pilot alongside current nautical charts. The Coast Pilot describes bridge types, clearances and operating procedures; check the current bridge operator information for opening times and temporary restrictions.

Bridge Manual

How to Read the Clearances

  • Fixed bridge: The bridge does not open for your vessel. You must fit beneath it.
  • Drawbridge: The listed clearance is generally the clearance when the bridge is closed. A vessel taller than that may be able to pass when the bridge opens.
  • Mean high water (MHW): Charted vertical clearances are generally referenced to mean high water unless otherwise specified. Actual clearance decreases as the water level rises above that reference.
  • Air draft: Measure from the actual waterline to the highest point of your boat, including antennas, radar, lights, outriggers and mast-mounted equipment.

For planning, leave a margin rather than aiming to squeeze beneath a bridge at your boat's stated air draft.

On every card below

Each card lists the bridge type, vertical clearance (closed position for opening bridges), horizontal clearance, operating schedule and notes, and the tender radio channel from our verified bridge directory.

Schedules and clearances change with construction, special events and Coast Guard rule changes. Confirm with the bridge tender, the current Coast Pilot and the Local Notice to Mariners before every transit.

Bridge Directory

Palm Beach County

The following are published bridge clearances for the principal Intracoastal route. The values are in feet; confirm opening schedules with the bridge tender before transit.

  • Hobe Sound Bridge (SR 708)

    ICW Mile 995.9

    Just north of the Palm Beach County line (Martin County), on the ICW route north from Jupiter.

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Opens on demand
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Jupiter Island Bridge (SR 707)

    ICW Mile 1004.1

    Bascule
    Vertical clearance (closed)
    25 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Opens on demand
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • US 1 Federal Bridge

    ICW Mile 1004.8

    Bascule
    Vertical clearance (closed)
    26 ft
    Horizontal clearance
    42 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Alternate A1A Bridge

    Loxahatchee River

    Fixed
    Vertical clearance
    25 ft
    Horizontal clearance
    60 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Florida East Coast Railway Bridge

    Loxahatchee River Mile 1.2

    Bascule (Rail)Low clearance
    Vertical clearance (closed)
    4 ft
    Horizontal clearance
    40 ft
    Operating schedule & notes
    Normally locked open; lowers automatically for trains
    Tender radio
    Not listed
    📋 View District 7 Notices to Mariners
  • Indiantown Road Bridge (SR 706)

    ICW Mile 1006.2

    Bascule
    Vertical clearance (closed)
    35 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Donald Ross Road Bridge

    ICW Mile 1009.3

    Bascule
    Vertical clearance (closed)
    35 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • PGA Boulevard Bridge (SR 786)

    ICW Mile 1012.6

    Bascule
    Vertical clearance (closed)
    24 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Parker Bridge (US 1)

    ICW Mile 1014.3

    Bascule
    Vertical clearance (closed)
    25 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Jerry Thomas Memorial Bridge

    ICW Mile 1017.6

    Fixed
    Vertical clearance
    65 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Flagler Memorial Bridge

    ICW Mile 1021.8

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Weekday commuter curfews apply
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Royal Park Bridge

    ICW Mile 1022.6

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Weekday commuter curfews apply
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Southern Boulevard Bridge

    ICW Mile 1024.7

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Lake Worth Avenue Bridge (SR 802)

    ICW Mile 1028.8

    Bascule
    Vertical clearance (closed)
    35 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    38 ft at center channel line
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Ocean Avenue Bridge (Lantana)

    ICW Mile 1031.0

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Ocean Avenue Bridge (Boynton)

    ICW Mile 1035.0

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Atlantic Avenue Bridge (SR 806)

    ICW Mile 1039.6

    BasculeLow clearance
    Vertical clearance (closed)
    12 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Critical low clearance
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Linton Boulevard Bridge

    ICW Mile 1041.1

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Spanish River Boulevard Bridge

    ICW Mile 1044.9

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    25 ft at center channel line
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Palmetto Park Road Bridge

    ICW Mile 1046.4

    Bascule
    Vertical clearance (closed)
    19 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    19 ft clearance at center
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • East Camino Real Bridge

    ICW Mile 1047.4

    BasculeLow clearance
    Vertical clearance (closed)
    9 ft
    Horizontal clearance
    80 ft
    Operating schedule & notes
    Critical low clearance
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners

Particularly important: The Florida East Coast Railway bridge on the Loxahatchee River is listed with only 4 feet of clearance when closed. The Atlantic Avenue and East Camino Real bridges are also low-clearance drawbridges. Do not assume a bridge will open on demand or that a clearance figure alone tells you when it will open.

Bridge Directory

Broward County

These are the major bridges through Pompano Beach, Fort Lauderdale, Dania Beach and Hollywood. Some older local directories differ from newer charting information, so use these figures as a route-planning checklist and confirm them before transit.

  • Hillsboro Boulevard Bridge

    ICW Mile 1050.0

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Sits directly on county line
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • NE 14th Street Causeway

    ICW Mile 1052.3

    Bascule
    Vertical clearance (closed)
    15 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Atlantic Boulevard (SR 814)

    ICW Mile 1054.0

    Bascule
    Vertical clearance (closed)
    15 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Commercial Boulevard

    ICW Mile 1059.0

    Bascule
    Vertical clearance (closed)
    15 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Oakland Park Boulevard (SR 816)

    ICW Mile 1060.5

    Bascule
    Vertical clearance (closed)
    22 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Sunrise Boulevard (SR 838)

    ICW Mile 1062.2

    Bascule
    Vertical clearance (closed)
    16 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Under active construction restrictions
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Las Olas Boulevard

    ICW Mile 1063.8

    Bascule
    Vertical clearance (closed)
    31 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • SE 17th Street Causeway

    ICW Mile 1065.9

    Bascule
    Vertical clearance (closed)
    55 ft
    Horizontal clearance
    125 ft
    Operating schedule & notes
    Port Everglades shipping gateway
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Dania Beach Boulevard

    ICW Mile 1069.5

    Bascule
    Vertical clearance (closed)
    22 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Sheridan Street

    ICW Mile 1071.5

    Bascule
    Vertical clearance (closed)
    22 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Hollywood Boulevard (SR 820)

    ICW Mile 1072.2

    Bascule
    Vertical clearance (closed)
    25 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Hallandale Beach Boulevard

    ICW Mile 1074.0

    Bascule
    Vertical clearance (closed)
    26 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted quarter-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Whiskey Creek Entrance Bridges

    Side Channel off Mile 1066

    FixedLow clearance
    Vertical clearance
    10 ft
    Horizontal clearance
    Varies
    Operating schedule & notes
    Side channel fixed spans
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • SE 3rd Avenue Bridge

    New River Mile 1.4

    Bascule
    Vertical clearance (closed)
    16 ft
    Horizontal clearance
    60 ft
    Operating schedule & notes
    Opens on demand
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • South Andrews Avenue Bridge

    New River Mile 1.6

    Bascule
    Vertical clearance (closed)
    21 ft
    Horizontal clearance
    60 ft
    Operating schedule & notes
    Opens on demand
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Florida East Coast Railway Bridge

    New River Mile 1.1

    Bascule (Rail)Low clearance
    Vertical clearance (closed)
    4 ft
    Horizontal clearance
    60 ft
    Operating schedule & notes
    Defaults open; triggers shut via rail yard dispatch
    Tender radio
    Not listed
    📋 View District 7 Notices to Mariners
  • William H. Marshall Memorial

    New River Mile 2.4

    Bascule
    Vertical clearance (closed)
    15 ft
    Horizontal clearance
    60 ft
    Operating schedule & notes
    Opens on demand
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • SR 84 Bridge

    New River South Fork

    Fixed
    Vertical clearance
    21 ft
    Horizontal clearance
    44 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners

The 17th Street Causeway bridge is an important access point for Port Everglades. Although its published authorized clearance is much greater than most Broward drawbridges, check its current operating status and opening rules. Whiskey Creek and smaller side waterways have significantly lower clearances than the main ICW.

Bridge Directory

Miami-Dade County

Miami has several separate navigational corridors. The bridge clearance depends on whether you are following the main ICW, entering Miami Beach canals, crossing toward Key Biscayne or traveling up the Miami River.

  • NE 192nd Street Bridge

    ICW Mile 1075.0

    Fixed
    Vertical clearance
    65 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Sunny Isles Boulevard / SR 826

    ICW Mile 1076.0

    Bascule
    Vertical clearance (closed)
    30 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • 79th Street Causeway (East Span)

    ICW Mile 1081.6

    Bascule
    Vertical clearance (closed)
    25 ft
    Horizontal clearance
    65 ft
    Operating schedule & notes
    Weekday commuter curfews apply
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Julia Tuttle Causeway (I-195)

    ICW Mile 1087.1

    Fixed
    Vertical clearance
    56 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    CRITICAL ICW ROUTE FIXED CHOKE POINT
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • MacArthur Causeway (I-395)

    ICW Mile 1088.2

    Fixed
    Vertical clearance
    65 ft
    Horizontal clearance
    130 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • PortMiami Fixed Highway Bridge

    Dodge Island Cutoff

    Fixed
    Vertical clearance
    65 ft
    Horizontal clearance
    100 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Venetian Causeway (East Span)

    Miami Beach Channel

    BasculeLow clearance
    Vertical clearance (closed)
    12 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Venetian Causeway (West Span)

    ICW Mile 1088.6

    BasculeLow clearance
    Vertical clearance (closed)
    12 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Restricted half-hour schedule
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Rickenbacker Causeway

    Biscayne Bay Route

    Fixed
    Vertical clearance
    76 ft
    Horizontal clearance
    120 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Julia Tuttle (East Fixed Span)

    Miami Beach Channel

    Fixed
    Vertical clearance
    35 ft
    Horizontal clearance
    50 ft
    Operating schedule & notes
    Side channel fixed span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Collins Canal Fixed Bridges

    Miami Beach Canals

    FixedLow clearance
    Vertical clearance
    5 ft
    Horizontal clearance
    Varies
    Operating schedule & notes
    Extreme low residential clearances
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Brickell Avenue Bridge

    Miami River Mile 0.1

    Bascule
    Vertical clearance (closed)
    Variable
    Horizontal clearance
    110 ft
    Operating schedule & notes
    Arched leaves require piling gauge check
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Miami Avenue Bridge

    Miami River Mile 0.3

    Bascule
    Vertical clearance (closed)
    Variable
    Horizontal clearance
    115 ft
    Operating schedule & notes
    Arched leaves require piling gauge check
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • SW 2nd Avenue Bridge

    Miami River Mile 0.5

    Bascule
    Vertical clearance (closed)
    Variable
    Horizontal clearance
    115 ft
    Operating schedule & notes
    Arched leaves require piling gauge check
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners

The Julia Tuttle Causeway's 56-foot fixed span is identified by NOAA as the lowest fixed bridge on the main ICW route between Norfolk and Miami. The Venetian Causeway is a separate route with low drawbridges, so a boat that can clear the Julia Tuttle Bridge may still need bridge openings on the Venetian route.

Bridge Directory

Florida Keys

The Keys have both a northern inside-waterway route through Florida Bay and a southern route through Hawk Channel. Cross-island cuts can have much lower clearances than the main highway bridges.

The former swing span at Seven Mile Bridge over Moser Channel has been removed. NOAA lists the nearby fixed highway bridge at 65 feet. Do not confuse that span with other bridges along the old and current Overseas Highway alignments.

The northern alternate route through Big Spanish Channel is especially sensitive to shoaling and submerged pilings. NOAA's Coast Pilot warns that local knowledge is advisable for this route. For remote routes beyond Key West, consult current charts for the actual approach rather than relying on a generalized bridge list.

Upper Keys: Key Largo, Tavernier and Islamorada

  • Card Sound Highway Bridge

    Card Sound Channel

    Fixed
    Vertical clearance
    65 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Jewfish Creek Highway Bridge

    ICW Mile 1134.1

    Fixed
    Vertical clearance
    67 ft
    Horizontal clearance
    100 ft
    Operating schedule & notes
    Fixed Span
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Tavernier Creek Highway Bridges

    Tavernier Creek

    Fixed
    Vertical clearance
    15 ft
    Horizontal clearance
    30 ft
    Operating schedule & notes
    Overhead utility lines cross here
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Snake Creek Bridge

    ICW Mile 1156.0

    Bascule
    Vertical clearance (closed)
    27 ft
    Horizontal clearance
    60 ft
    Operating schedule & notes
    Hourly daylight blocks; Opens on demand overnight
    Tender radio
    VHF Channel 9
    📋 View District 7 Notices to Mariners
  • Whale Harbor Channel Bridges

    Islamorada Area

    FixedLow clearance
    Vertical clearance
    12 ft
    Horizontal clearance
    32 ft
    Operating schedule & notes
    Overhead utility wires may be lower than bridge arch
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Tea Table Key Channel Bridges

    Islamorada Area

    FixedLow clearance
    Vertical clearance
    10 ft
    Horizontal clearance
    35 ft
    Operating schedule & notes
    10 ft vertical limits at adjacent pipeline span
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Lignumvitae Channel Bridges

    Lower Matecumbe Cut

    FixedLow clearance
    Vertical clearance
    10 ft
    Horizontal clearance
    35 ft
    Operating schedule & notes
    10 ft vertical limits at parallel utility cable
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Channel Two Bridges

    Channel Two Cut

    FixedLow clearance
    Vertical clearance
    11 ft
    Horizontal clearance
    35 ft
    Operating schedule & notes
    Fixed spans over minor cut slough
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Channel Five Crossing

    Channel Five Main Cut

    Fixed
    Vertical clearance
    65 ft
    Horizontal clearance
    90 ft
    Operating schedule & notes
    Main blue-water cross-island fixed gateway
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners

Watch out: Snake Creek can have strong currents, especially near the bridge. Whale Harbor and several cross-island channels have low overhead clearances, and overhead cables or pipelines may be the limiting obstruction even where the bridge itself appears higher.

Middle Keys: Marathon and the Seven Mile Bridge area

  • Knight Key Channel Bridges

    West of Marathon

    Fixed
    Vertical clearance
    19 ft
    Horizontal clearance
    35 ft
    Operating schedule & notes
    Fixed spans over shallow bank flats
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Seven Mile Bridge (Moser Channel)

    Moser Channel

    Fixed
    Vertical clearance
    65 ft
    Horizontal clearance
    400 ft
    Operating schedule & notes
    Old swing leaves removed entirely
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Boot Key Harbor Entrance Span

    Marathon Cut

    Open
    Vertical clearance
    Unlimited
    Horizontal clearance
    40 ft
    Operating schedule & notes
    Bascule leaves completely cut away and removed
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Bahia Honda Channel Crossing

    Bahia Honda Key

    Fixed
    Vertical clearance
    21 ft
    Horizontal clearance
    50 ft
    Operating schedule & notes
    Modern highway span clearance
    Tender radio
    Not required
    📋 View District 7 Notices to Mariners
  • Long Key Cross-Island Channels

    Middle Keys

    Fixed
    Vertical clearance
    Varies
    Horizontal clearance
    40 ft
    Operating schedule & notes
    Clearance varies heavily across individual cut sloughs
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners

The former swing span at Seven Mile Bridge over Moser Channel has been removed. NOAA lists the nearby fixed highway bridge at 65 feet. Do not confuse that span with other bridges along the old and current Overseas Highway alignments.

Lower Keys and Key West

  • Big Spanish Channel Route Spans

    Lower Keys Route

    FixedLow clearance
    Vertical clearance
    11 ft
    Horizontal clearance
    32 ft
    Operating schedule & notes
    Shifting shoals and sand obstructions dominate channel
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Niles Channel Bridges

    Lower Keys

    Fixed
    Vertical clearance
    40 ft
    Horizontal clearance
    75 ft
    Operating schedule & notes
    Fixed spans over deepwater pass
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Cow Key Channel Crossings

    Stock Island

    FixedLow clearance
    Vertical clearance
    10 ft
    Horizontal clearance
    30 ft
    Operating schedule & notes
    Minor coastal channel access bridge
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Boca Chica Channel Crossings

    East of Key West

    Fixed
    Vertical clearance
    14 ft
    Horizontal clearance
    35 ft
    Operating schedule & notes
    Borders military restricted operational airspace
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners
  • Key West Harbor Main Channels

    Key West

    Open
    Vertical clearance
    Unlimited
    Horizontal clearance
    Unlimited
    Operating schedule & notes
    No overhead structures cross main deepwater approaches
    Tender radio
    Not applicable (does not open)
    📋 View District 7 Notices to Mariners

The northern alternate route through Big Spanish Channel is especially sensitive to shoaling and submerged pilings. NOAA's Coast Pilot warns that local knowledge is advisable for this route. For remote routes beyond Key West, consult current charts for the actual approach rather than relying on a generalized bridge list.

Bridge Directory

Additional Low-Clearance Waterways to Check

The main ICW figures above do not cover every residential canal, river branch or marina entrance. If your route enters any of the following, verify every bridge and overhead cable on that specific route:

  • West Palm Beach Canal

    A fixed highway bridge is listed at 12 ft near the canal mouth.

    📋 View District 7 Notices to Mariners
  • Little Lake Worth entrance

    A1A fixed bridge listed at 8 ft.

    📋 View District 7 Notices to Mariners
  • Miami Beach / Collins Canal

    Some fixed bridges are listed as low as 5 ft.

    📋 View District 7 Notices to Mariners
  • Mercedes River, Fort Lauderdale

    Fixed bridge listed at 7 ft.

    📋 View District 7 Notices to Mariners
  • Marietta River, Fort Lauderdale

    Fixed bridge listed at 8 ft.

    📋 View District 7 Notices to Mariners
  • Dania Cut-Off Canal

    Bridges and other structures restrict portions of the canal to approximately 9.5 ft overhead clearance.

    📋 View District 7 Notices to Mariners
  • Coral Gables Waterway

    Check the specific route and all overhead utilities before entering.

    📋 View District 7 Notices to Mariners
  • Residential canals and marina basins

    Local restrictions and overhead structures can be lower than the main ICW bridge clearances.

    📋 View District 7 Notices to Mariners

These smaller waterways are particularly important for vessels with tall hardtops, radar arches, antennas, outriggers or masts.

Bridge Manual

Official References to Save

  • NOAA U.S. Coast Pilot 4

    The primary reference for the Atlantic coast from Cape Henry to Key West, including the Intracoastal Waterway. Chapter 12 covers the ICW and its bridge descriptions.

    Open NOAA Coast Pilot 4
  • NOAA Nautical Charts

    Use the current chart for the exact bridge span, marked channel, horizontal clearance and surrounding obstructions.

    Open NOAA nautical chart resources
  • U.S. Coast Guard bridge and navigation information

    Check current navigation notices and bridge operating rules before departure, particularly where maintenance or closures may affect your route.

    Open Coast Guard bridge clearance guidance

Before you use this list

This is a regional planning directory, not an exhaustive certified list of every bridge in every canal. Bridge reconstruction, repairs, water level and chart corrections can affect the clearance you actually encounter.

For your own boat, the most useful next step is to build a route-specific bridge spreadsheet with bridge name, waterway mile, clearance, fixed/drawbridge status, opening schedule, VHF channel, source and date verified. That makes it much easier to identify the controlling bridge for each trip.